Houses from the GAMA collection look extremely modern and elegant from the outside, exuding minimalist design and refined style. Their flat roof gives them a classic and modern look, perfectly matching current architectural trends. They consist of two floors, which allows for a well-thought-out arrangement of rooms, ensuring functionality and comfort for residents. The interior has been carefully planned to make maximum use of the available space, while maintaining harmony and ergonomics.
As a manufacturer, we build houses from the foundation to the furniture, providing comprehensive service to our clients. Our experience and involvement in every stage of construction guarantee high quality and perfect workmanship. The garage or carport option adds extra charm
See the base project card:
Prices (net) given on the website are for information purposes and do not constitute a commercial offer within the meaning of Art. 66, paragraph 1 of the Civil Code.
We reserve the right to change the prices quoted.
We encourage you to contact our sales department, who will prepare an individual offer for you without obligation.
DES DELTA 65: closed shell scope (without foundation slab)
External wall construction 160mm X 60mm (C24/KVH wood)
- external diffusion open: ( Order from the outside)
- Structural board: (Fermacell board is a 12.5 mm thick Fermacell gypsum fiber board
* reaction to fire class A1 (Fire resistance of the partition
single layer 60 minutes.
According to the certificate, class '0'.
European class A2. )
Find out more about the Fermacell board HERE - wall structure made of Wood C24/KVH 160/6 mm or 160/5 mm
- thermal and acoustic mineral wool, 15 cm thick, ISOVER PIANO lambda 0.37,
- reaction to fire class A1,
- diffusion resistance u - 1 - specialized vapor barrier foil MDM® VERSO VCL 10, weight: 95 g/m2. Vapor barrier foil 2-
layered. Protects walls and ceilings against the penetration of water vapor.
- reaction to fire class E - 5 cm installation pre-walls in external walls made according to the detailed design
- Construction board: Fermacell, 12.5 mm thick
Construction of internal partition walls:
- Wooden frame 140mm x 60mm (C24/KVH wood).
- Walls finished with fermacell boards from the inside ( on both sides )
- thermal and acoustic mineral wool, 12 cm thick, ISOVER PIANO lambda 0.37,
- reaction to fire class A1,
- diffusion resistance u - 1,
Roof construction:
- construction of a roof structure with an integrated ceiling in a truss system,
- covering the surface with a vapor-permeable membrane VAXO XL ROOF MEMBRANE
basis weight: approx. 140 g / m2, thickness: 700 μm, water vapor penetration: Sd = 0.03 m - patching the roof slope for a previously selected roofing model,
- delivery and installation of PDT 19 roof panels from BLACHDOM Plus along with the lower eaves finishing,
- insulation of the ceiling constituting the lower strip of the roof truss with mineral glass wool λ = 0.035 o
30 cm thick, - construction of a steel structure for a suspended ceiling
- specialized vapor barrier foil MDM® VERSO VCL 10, weight: 95 g/m2. Vapor barrier foil 2-
layered. Protects walls and ceilings against the penetration of water vapor,
- reaction to fire class E, - installation of plasterboards,
- delivery and installation of gutter flashings made of 0.5mm coated steel sheet (color: RAL7016)
or RAL7024 or RAL 9005 or RAL 8017 or RAL 8004), PVC gutters of the building in the system (e.g. BRYZA or GALECO), along with the installation of visible pipes
drains from the manufacturer's basic color palette, - delivery and installation of a PP roof chimney constituting a vent for the sewage stack
(1 piece.), - delivery and installation of a PP roof chimney with a non-return valve providing ventilation for the hood
Window joinery:
- delivery and installation of window joinery in one-sided anthracite color. Frames made of
seven-chamber VEKA SOFTLINE 82MD profiles, 82 mm wide, reinforced with steel, with triple sealing. Triple glazing (insulated glass U=0.5 W/m2K) with a warm white frame,
without mullions and air vents. Window joinery equipped with fittings, e.g. from ROTO, - delivery and installation of terrace doors in one-sided anthracite color. Frames made of
seven-chamber VEKA SOFTLINE 82MD profiles, 82 mm wide, reinforced with steel, with triple
sealing. Triple glazing (insulated glass U=0.5 W/m2K) with a warm colored frame
anthracite, without mullions and air vents. Window joinery equipped with fittings, e.g. from ROTO
− 1 terrace door in the smart slide system
− tight installation of all window joinery
Door Joinery:
- delivery and installation of 1 piece of external entrance door, steel WIKĘD PREMIUM series,
pattern 12, anthracite color, door frame: 11, handle on both sides, aluminum threshold, opal glass, color
anthracite frames - delivery and installation of 1 piece of external entrance door to the utility room /
technical, steel by WIKĘD, PREMIUM series, pattern 26I, anthracite color, door frame: 11, handle with
two sides, aluminum threshold, - performing tight door installation
Transport and Assembly of the Building:
- Transport up to 60 km from Bielsko-Biała
- Building assembly: up to 60 km from Bielsko-Biała
DES DELTA 65: closed shell range
Foundation slab
Earthworks related to the preparation of the foundation slab: (If part of the contract)
- Backhoe loader work, needed to prepare a standard foundation
- Soil from the excavation put into storage
- Supervision of the excavator's work while shaping the excavation and backfilling it -
- Mechanical compaction of the subgrade
- Foundation works-
- Construction of the sewage system under the foundation slab and - leading the main sewage pipe ∅160 outside the building outline
- Constructing a culvert in the slab for the water connection and leading it outside the building -
- Leading the duct supplying air to the fireplace outside the slab (if present)
- Construction of an electrical bushing between the switchgear in the building and the edge of the slab
- Construction of up to 3 utility culverts through the foundation slab (e.g. culvert for intercom, water, garden electrical cables, etc.)
- Construction of the main foundation slab
- Execution of full reinforcement of the foundation slab AIIIN-steel
- Pouring the foundation slab with concrete
- Disc seizing
- Unloading materials at the construction site
- Insulating edge elements d=8.0 cm (slab base)
- C25/30 (B30) structural concrete with a pump, waterproof class W8
External wall construction 160mm X 60mm (C24/KVH wood)
- external diffusion open: ( Order from the outside)
- Structural board: (Fermacell board is a 12.5 mm thick Fermacell gypsum fiber board
* reaction to fire class A1 (Fire resistance of the partition
single layer 60 minutes.
According to the certificate, class '0'.
European class A2. )
Find out more about the Fermacell board HERE - wall structure made of Wood C24/KVH 160/6 mm or 160/5 mm
- thermal and acoustic mineral wool, 15 cm thick, ISOVER PIANO lambda 0.37,
- reaction to fire class A1,
- diffusion resistance u - 1 - specialized vapor barrier foil MDM® VERSO VCL 10, weight: 95 g/m2. Vapor barrier foil 2-
layered. Protects walls and ceilings against the penetration of water vapor.
- reaction to fire class E - 5 cm installation pre-walls in external walls made according to the detailed design
- Construction board: Fermacell, 12.5 mm thick
Construction of internal partition walls:
- Wooden frame 140mm x 60mm (C24/KVH wood).
- Walls finished with fermacell boards from the inside ( on both sides )
- thermal and acoustic mineral wool, 12 cm thick, ISOVER PIANO lambda 0.37,
- reaction to fire class A1,
- diffusion resistance u - 1,
Roof construction:
- construction of a roof structure with an integrated ceiling in a truss system,
- covering the surface with a vapor-permeable membrane VAXO XL ROOF MEMBRANE
basis weight: approx. 140 g / m2, thickness: 700 μm, water vapor penetration: Sd = 0.03 m - patching the roof slope for a previously selected roofing model,
- delivery and installation of PDT 19 roof panels from BLACHDOM Plus along with the lower eaves finishing,
- insulation of the ceiling constituting the lower strip of the roof truss with mineral glass wool λ = 0.035 o
30 cm thick, - construction of a steel structure for a suspended ceiling
- specialized vapor barrier foil MDM® VERSO VCL 10, weight: 95 g/m2. Vapor barrier foil 2-
layered. Protects walls and ceilings against the penetration of water vapor,
- reaction to fire class E, - installation of plasterboards,
- delivery and installation of gutter flashings made of 0.5mm coated steel sheet (color: RAL7016)
or RAL7024 or RAL 9005 or RAL 8017 or RAL 8004), PVC gutters of the building in the system (e.g. BRYZA or GALECO), along with the installation of visible pipes
drains from the manufacturer's basic color palette, - delivery and installation of a PP roof chimney constituting a vent for the sewage stack
(1 piece.), - delivery and installation of a PP roof chimney with a non-return valve providing ventilation for the hood
Window joinery:
- delivery and installation of window joinery in one-sided anthracite color. Frames made of
seven-chamber VEKA SOFTLINE 82MD profiles, 82 mm wide, reinforced with steel, with triple sealing. Triple glazing (insulated glass U=0.5 W/m2K) with a warm white frame,
without mullions and air vents. Window joinery equipped with fittings, e.g. from ROTO, - delivery and installation of terrace doors in one-sided anthracite color. Frames made of
seven-chamber VEKA SOFTLINE 82MD profiles, 82 mm wide, reinforced with steel, with triple
sealing. Triple glazing (insulated glass U=0.5 W/m2K) with a warm colored frame
anthracite, without mullions and air vents. Window joinery equipped with fittings, e.g. from ROTO
− 1 terrace door in the smart slide system
− tight installation of all window joinery
Door joinery:
- delivery and installation of 1 piece of external entrance door, steel WIKĘD PREMIUM series,
pattern 12, anthracite color, door frame: 11, handle on both sides, aluminum threshold, opal glass, color
anthracite frames - delivery and installation of 1 piece of external entrance door to the utility room /
technical, steel by WIKĘD, PREMIUM series, pattern 26I, anthracite color, door frame: 11, handle with
two sides, aluminum threshold, - performing tight door installation
Transport and Assembly of the Building:
- Transport up to 60 km from Bielsko-Biała
- Building assembly: up to 60 km from Bielsko-Biała
The development stage includes all options for the shell and closed shell state and:
Electrical installation:
- execution of lighting installation inside the building according to the design,
- execution of power supply installation (230 V) inside the building according to the design, outside the building according to
project, - execution of a three-phase power supply installation (400 V) inside the building (1 point),
- execution of telecommunications installation inside the building (1 point), with connection to the switchboard,
- execution of intercom installation inside the building (1 point) with connection to the switchboard,
- connecting the electrical installation to the grounding hoop,
- delivery and assembly of switchboards according to the design,
- delivery and installation in the switchboard: main disconnector (1 pc.), residual current circuit breakers
three-phase or single-phase (4 pcs.), single-phase circuit breakers (16 pcs.), circuit breaker
three-phase overcurrent (3 pcs), surge arrester (1 pc), phase control indicator (1 pc), - testing of resistance in electrical installation circuits and the effectiveness of anti-shock protection
Mechanical ventilation installation (recuperation)
- installation according to the design in a system of flexible PE conduits according to the design,
- delivery and installation of the iZZi REQUNET V.302/402 ERV air handling unit with an enthalpy exchanger
warm (provides adequate humidity in the house in autumn and winter) and energy-saving
EC fan,
delivery and installation of an LCD panel for control, - delivery and installation of a wall intake and roof outlet,
- starting the recuperator with measurements of installation expenses
Water and sewage installation:
- execution of internal cold water and hot water installations, with coated PP pipes
CLIMAFLEX by design - execution of internal sewage system with PVC pipes according to the design
- performing a tightness test of the water installation.
Central heating installation:
- execution of a complete low-temperature underfloor heating installation,
- delivery and installation of 2 pieces of 8-circuit manifold with a cabinet
- delivery and installation of the All in One 7 kW Panasonic heat pump with a 185 liter tank
- making a floor with dry screed
Facade insulation and silicone plaster finishing:
- facade mineral wool, 10 cm thick, ISOVER FASOTERM 35 lambda 0.35,
- reaction to fire class A1,
- diffusion resistance u- 1 - Mesh and glue
- execution of hybrid silicone-acrylic STO plaster dedicated to frame houses
(in basic light colors)
The turnkey state includes all options for the shell and development state as well as:
Door Joinery (Interior):
- Dewro Brand Doors - Standard Line
Floor Finishing:
- Standard Barlinek board (price group I)
- Opoczno/Komfort porcelain tiles (1st Price Group) in the bathroom on the floor and in the wet shower area
Wall finishing:
- additional plasterboard mounted to the Fermacell board to avoid cracks on the walls
- Ceramic Paint (2 times painting)
- Skirting boards
- In the bathroom on the walls outside the shower zone - Wall cladding made of laminated board (Egger)
Ceiling finishing:
- GK board
- Ceramic paint (2 times painting)
Electrical installation equipment:
- Legrand switches and sockets - SUNO line
Bathroom fittings and ceramics:
- Washbasin and shower taps: ROCA "ONA" line:
- Concealed frame/WC bowl: ROCA "Meridian" line
- Countertop washbasin: ROCA, "ONA" line
- GROHE bathroom accessories (toilet paper holder, brush holder and container, towel holder
Shower:
- WalkIN system, i.e. a rope drain and a safety glass
Bathroom furniture:
- Bathroom cabinet under the washbasin
- cabinet with a mirror on the washbasin
- cabinet above the "geberit" buildings
Kitchen furniture:
- Kitchen furniture by design
- Furniture fronts and bodies made of Egger furniture board
- Egger top 38 mm, laminated
- Countertop sink
- Fittings: ( Blum hinges and guides for drawers
- Front opening system: TipOn
- Refrigerator building (without refrigerator)
- 1 Full height Cargo cabinet
- wall cladding between cabinets made of Egger laminated board
Furniture in the living room
- TV cabinet made of Egger furniture board
Furniture in a large bedroom:
- Wardrobe construction, made of Egger furniture boards. Equipped with paths and shelves
Furniture in a small bedroom:
- Wardrobe construction, made of Egger furniture boards. Equipped with paths and shelves.
Furniture in the corridor:
- Wardrobe construction, made of Egger furniture boards. The cabinets house the heat pump central unit, the domestic hot water tank and the electrical switchgear.
Lighting and lamps:
- ceiling lighting in the form of downlight; Nowodvorski EGINA ceiling eyelets
- decorative hanging lamp above the dining room table
- decorative hanging lamp over the island
Decor:
- Curtain rods and curtains on the windows
- Eco Premium Package: Surcharge for changing stone wool to wood wool: +PLN 10,000.00
- Small Pergola: + PLN 22,000.00
- Large pergola: + PLN 29,000.00
- Single-car garage : + PLN 55,000.00
- Two-car garage: + PLN 75,000.00
- Single-station carport : + PLN 35,000.00
- Two-station Carport: + PLN 45,000.00
- Changing PVC window joinery to aluminum joinery: + PLN 18,000.00
- Wooden facade package for the DES DELTA 65 house + PLN 20,000.00
- Wooden façade package for the garage: + PLN 18,000.00
- Photovoltaic installation with a capacity of 5.8-6.4 kWp: + PLN 19,000
- Stylistic bay windows in window linings: + PLN 4,500.00
- Decorative lighting of the facade: + PLN 3,000.00
- Changing the color of window joinery: + PLN 4,000.00
- Changing the color of the roof and sheet metal flashings: + PLN 2,500
- Changing the color of external doors: +PLN 1,500.00
- Plot analysis: PLN 1,500
- Work related to obtaining a building permit: PLN 15,000
- Interior Design (DELTA 65): PLN 12,000
Adapting a ready-made ATEPAA house to local conditions and possible individual needs is a process that provides customers with full flexibility and adaptation to their requirements. Our company offers comprehensive adaptation services that allow you to modify existing projects in such a way that they perfectly fit specific local conditions and meet customer expectations.
Our experience and commitment to the adaptation process guarantees that the finished ATEPAA house will be properly adapted to local building regulations, climatic conditions and the aesthetic preferences of the client. As part of the adaptation, we can make changes to the room layout, sizes or finishing materials to meet the individual needs of our clients.
Additionally, our design team can advise clients on issues related to energy efficiency, use of natural light and space optimization to create a home that not only meets their expectations, but also brings benefits in everyday use.
The price of adapting a ready-made ATEPAA house to local conditions and individual needs may vary depending on the scope of changes and the specificity of the project. Our team is ready to cooperate and adapt to any challenge to provide clients with the perfect solution tailored to their needs and capabilities.
Download the views of the DES DELTA 70 Model - Here
zasięg działania
W tej chwili, ze względu na znaczne obłożenie, realizujemy projekty na terenach województw: śląskiego, małopolskiego i opolskiego. W promieniu 80 km od Bielska-Białej transport i logistyka projektu są gratis. Praca nad projektami w bardziej odległych lokalizacjach wymaga wcześniejszych indywidualnych ustaleń.
Success is the result of cooperation and teamwork. In the case of ATEPAA, we work hand in hand with the investor to effectively share responsibilities and achieve common goals. Our company undertakes comprehensive responsibility for the entire construction process, and cooperation with the investor from the very beginning is the key to success.
Commitment and communication are key elements of our cooperation. Together, we set goals, discuss project details and set clear goals to ensure a smooth construction process. Thanks to this, each stage of implementation is carefully planned and monitored, which accelerates the pace of work and allows you to achieve your dream implementation as quickly as possible.
Our experience and individual approach to each project make us able to adapt to the needs and expectations of our clients. Thanks to cooperation based on trust and shared commitment, we can achieve success together and create a house that will meet all the investor's expectations.
To analyze the technical and legal possibilities - the Investor provides us with an excerpt and excerpt from the local development plan.
- Analysis of technical possibilities, access roads, overhead lines and electric lines.
- Analysis of the local development plan in terms of legal and technical possibilities of planned house construction.
Adaptation of the DES base design.
- Geological survey of the ground, preparation of the foundation in accordance with the design guidelines for the foundation slab.
- Construction of part of the underground sewage system and culverts for utilities.
- Construction of underground parts of the installation.
- Sending a copy of the building permit to ATEPAA
- Appointment of a construction manager.
- Notification of commencement of construction works
- Providing access to electricity - during construction.
Comprehensive investment implementation in accordance with the concluded contract.