House finishing condition (Net prices)

Eco-Friendly House in Frame Technology with an Area of 80 m²

The eco-friendly house in frame technology with an area of 80 m² is a spacious and functional project that harmoniously combines modern style with ecological solutions. This compact, single-story building is designed with the residents' comfort in mind, offering a space conducive to daily living.

Key Features of the House:

  • Thoughtful Architecture: The 80 m² house is an excellent solution for families or individuals who wish to enjoy comfort in smaller spaces. Thanks to the optimal room layout, every square meter is used efficiently.

  • Spacious Living Room: The open living area with large windows provides natural lighting and brings elements of nature into the interior. The living room becomes an ideal place for relaxation and gatherings with family and friends.

  • Functional Kitchen: The modern kitchen with an ergonomic layout facilitates daily cooking. The connection with the dining area creates an open space conducive to shared meals and family moments.

  • Comfortable Bedrooms: The house is equipped with two cozy bedrooms that offer intimacy and comfort. The thoughtful room arrangement allows for free use of space while ensuring adequate privacy.

  • Eco-Friendly Technologies: Houses in frame technology are designed with energy efficiency in mind. By using eco-friendly materials and energy-saving systems, residents can enjoy low operating costs and an environmentally friendly lifestyle.

  • Aesthetics and Style: The classic hip roof and minimalist form of the building give it a modern character. The house blends into various surroundings, both rural and urban, creating a harmonious whole.

Summary

The eco-friendly house with an area of 80 m² is an ideal proposition for those looking for functional and aesthetic solutions. Its thoughtful design, combination of ecological technologies, and modern style make it a dream living space.



Net area: 94 sq m.

Usable area: 80 sq m.

Built-up area: 85 sq m.

Building height at ridge: 6.26 m.

Number of floors: 1 + mezzanine

Item is in stock Only 0 left in stock Item is out of stock Item is unavailable

Bought together

  • Prefabricated diffusely open external and internal walls
  • Ceiling and roof structure with Ruukki Classic sheet metal panels
  • Window joinery on VEKA profiles
  • Entrance doors
  • Building transport and assembly up to 80 km from Bielsko-Biała

Developer state includes all options of the closed shell state and:

  • Foundation slab and XPS 10 cm insulation (without substructure)
  • Elevation made on facade wool and silicate-silicone plaster
  • Floor insulation with XPS
  • Electrical installation
  • Water and sewage installation
  • Underfloor heating installation
  • Screed

Turnkey state includes all options of the closed raw state and developer state, as well as:

Door Joinery (Interior):

  • Dewro Brand Doors - Standard Line

Floor Finishes:

  • Barlinek Standard Board (Price group I)
  • Opoczno/Komfort Porcelain Tiles (Price Group I) in the bathroom on the floor and wet shower area

Wall Finishes:

  • additional GK board mounted to Fermacell board to avoid cracks on the walls
  • Ceramic paint (2 coats)
  • Baseboards
  • In the bathroom on the walls outside the shower area - Wall cladding made of laminated board (Egger)

Ceiling Finishes:

  • GK Board
  • Ceramic paint (2 coats)

Electrical installation equipment:

  • Legrand switches and sockets - SUNO Line

Bathroom Fittings and Ceramics:

  • ROCA "ONA" Line sink and shower faucets:
  • ROCA "Meridian" Line concealed frame/toilet bowl:
  • ROCA "ONA" Line countertop sink:
  • GROHE bathroom accessories (toilet paper holder, brush holder, towel holder)

Shower Cabin:

  • WalkIN system, i.e., linear drain and safety glass

Bathroom Furniture:

  • Bathroom cabinet under the sink
  • cabinet with mirror above the sink
  • cabinet above the "Geberit" installation


Kitchen Furniture:

  • Kitchen furniture according to the design
  • Furniture fronts and bodies made of Egger furniture board
  • Egger 38 mm laminated countertop
  • Countertop sink
  • Fittings: (Blum brand hinges and drawer slides)
  • TipOn type front opening system
  • Refrigerator housing (Without refrigerator)
  • 1 Cargo cabinet full height
  • wall cladding between cabinets made of laminated Egger board

Built-in furniture in the living room

  • TV cabinet made of Egger furniture board

Built-in furniture in the master bedroom:

  • Wardrobe built-ins, made of Egger furniture boards. Equipped with rods and shelves

Built-in furniture in small bedrooms:

  • Built-in wardrobes, made from Egger furniture boards. Equipped with rods and shelves.

Built-in furniture in the hallway:

  • Built-in wardrobes, made from Egger furniture boards. The wardrobes enclose the central heat pump unit, the hot water tank, and the electrical panel.


Built-in furniture in the laundry/utility room

  • Built-in open shelves

Built-in furniture in the pantry:
Built-in open shelves.

Lighting and lamps:

  • ceiling lighting in the form of downlights; Nowodvorski EGINA ceiling spots
  • decorative hanging lamp over the dining table
  • decorative hanging lamp over the island

Decorations:

  • Curtain rods and curtains in the windows
  • Panasonic heat pump:
  • Mechanical ventilation - heat recovery:
  • Pergola:
  • Single Garage
  • Double Garage
  • Single Carport
  • Double Carport
  • Photovoltaic installation with a capacity of 5.8-6.4 kWp
  • Eco Premium Package: Surcharge for changing rock wool to wood wool
  • Wooden facade package for the house: Thermo pine and Wood of fire
  • Decorative facade lighting
  • Attic conversion
  • Change the color of window frames
  • Change the color of the roof and metalwork
  • Change the color of the exterior doors
  • Change to STO plaster
  • Change PVC window frames to aluminum frames
  • Stylistic bay windows in window recesses:
  • Plot analysis
  • Custom Design

WE INSULATE BUILDINGS EXCLUSIVELY WITH ROCK OR WOOD WOOL

We do not use styrofoam like many competing companies. Our houses comply with the principles of ecological construction.

PRICE AND PERFORMANCE GUARANTEE

Our company has a well-established position in the market. We manufacture the house structures as well as their furnishings ourselves. We employ over 200 specialists.

WOOD AND BUILDING MATERIALS ONLY WITH CERTIFICATION

KVH wood, finishing and decorative materials only from proven and best suppliers

Success is the result of teamwork and coordination. At ATEPAA, we work hand in hand with the investor to efficiently share responsibilities and achieve common goals. Our company takes comprehensive responsibility for the entire construction process, and collaboration with the investor from the very beginning is key to success.
Commitment and communication are key elements of our cooperation. Together, we set goals, discuss project details, and establish clear objectives to ensure a smooth construction process. As a result, every stage of implementation is meticulously planned and monitored, which accelerates the pace of work and allows us to achieve the desired move-in as quickly as possible.
Our experience and individual approach to each project enable us to adapt to the needs and expectations of our clients. Thanks to cooperation based on trust and mutual commitment, we can achieve success together and create a home that meets all the investor's expectations.

To analyze technical and legal possibilities - the Investor provides us with an extract and outline from the local spatial development plan.

  • Analysis of technical possibilities, access roads, and the course of overhead power lines.
  • Analysis of the local spatial development plan in terms of legal and technical possibilities of the planned house construction.

Adaptation of the base DES project.

  • Geological survey of the soil preparation of the substructure in accordance with the design guidelines for the foundation slab.
  • Execution of the underground part of the sewage system installation and media ducts.
  • Execution of underground parts of the installation.
  • Sending a copy of the building permit to ATEPAA
  • Appointment of a construction manager.
  • Notification of the start of construction works
  • Ensuring access to electricity - during construction.

Comprehensive investment implementation according to the concluded contract.